Dam 2

Dam 2 was raised in 2009 to pass the 100% Probable Maximum Flood (PMF).

Dam Dimensions

Type of Dimension Measurement
Location 1 mile east of Leander
Height 38 feet
Length 2,500 feet
Normal Pool Elevation
947.85 feet above mean sea level
Auxiliary Spillway Elevation
961.77 feet above mean sea level
Top of Dam Elevation
970.43 feet above mean sea level (effective)
Normal Storage Capacity
109 acre-feet

Dam 2 Construction Projects

Project
Status Contract
Start Date
Completion Date
Contractor
Dam 2
Complete $443,200
December 2008
September 2009
Capital Concrete Contractors